Loads
Medium-to-heavy and heavy loads, intensive wheeled traffic
Facilities
Warehouses, production, parking facilities, clean areas
Coating
Seamless, dust-free, easy to clean, chemical-resistant
LBC Industrial Floor · materials for industrial floors
PRASPAN® AC-C101 is a universal single-component acrylic coating for protecting mineral, concrete and steel substrates.
Engineering support from estimation to commissioning
Warehouse in Tashkent, Muynakskaya St., 135. Shipping across Uzbekistan and Tajikistan.
Loads
Medium-to-heavy and heavy loads, intensive wheeled traffic
Facilities
Warehouses, production, parking facilities, clean areas
Coating
Seamless, dust-free, easy to clean, chemical-resistant
What makes the system different and what tasks it is typically chosen for.
PRASPAN® AC-C101 polymer acrylic coating is a single-component system for protecting and decorating monolithic wall, floor and ceiling substrates such as concrete, mineral construction mortars and steel structures. It contains fillers, pigments and functional additives in a suspension of organic solvents and resins. This acrylic polyurethane coating is available from us at a competitive price in Yekaterinburg and in 20 cities across Russia and the CIS.
The material is used in projects where economic considerations do not justify the use of full-scale polymer floor systems. Typical applications include auto repair shops, underground parking facilities, garages and service areas.
To achieve the stated performance characteristics, the polymer acrylic coating must be applied only to a thoroughly cleaned surface prepared with a high-power construction vacuum cleaner.
Maximum recommended number of coats: 4.
Appearance of the finished surface: semi-matte.
Warranty period: 6 months from the date of manufacture in the manufacturer’s unopened original packaging.
Material parameters and substrate requirements (TDS/passport).
| Coating appearance | semi-matte |
| Mixture density at 20°C | 1500 kg/m³ |
| Mixture viscosity at 20°C | 3000 mPa·s |
| Intercoat interval at 20°C, minimum | after 24 hours |
| Intercoat interval at 20°C, maximum | after 3 days |
| Material consumption per 1 m² | 0,2–0,3 kg for the first coat, 0,1–0,2 kg for subsequent coats |
| Maximum number of coats | 4 |
| Curing time at 20°C, pedestrian traffic | after 24 hours |
| Curing time at 20°C, light traffic load | after 48 hours |
| Curing time at 20°C, full traffic load | after 3 days |
| Shore hardness (type D) after 7 days | 65 units |
Estimated calculation based on area and thickness.
TDS, MSDS and system certificates.
PDF · 2.3 MB
Quick contact
Message us or leave a request — we will respond quickly.