Loads
Medium-to-heavy and heavy loads, intensive wheeled traffic
Facilities
Warehouses, production, parking facilities, clean areas
Coating
Seamless, dust-free, easy to clean, chemical-resistant
LBC Industrial Floor · materials for industrial floors
Praspan® EP-P125 is a two-component epoxy primer without volatile solvents for dry concrete substrates.
Engineering support from estimation to commissioning
Warehouse in Tashkent, Muynakskaya St., 135. Shipping across Uzbekistan and Tajikistan.
Loads
Medium-to-heavy and heavy loads, intensive wheeled traffic
Facilities
Warehouses, production, parking facilities, clean areas
Coating
Seamless, dust-free, easy to clean, chemical-resistant
What makes the system different and what tasks it is typically chosen for.
Praspan® EP-P125 is a two-component epoxy primer system without volatile solvents for dry concrete substrates.
It is used as a primer with high physical and chemical performance for thick-layer cement-based coatings in industrial, commercial, residential and public buildings and structures.
The Praspan® EP-P125 primer consists of an epoxy resin, compatible chemical additives, a filler and a hardener.
Kit mass: 24.0 kg.
The material is a matte liquid without foreign inclusions. A yellow tint is possible. Natural sediment is allowed.
Crystallization of epoxy-resin-based materials
All produced materials (topcoats, primers, paints) that contain epoxy resins can harden (crystallize) during transportation or storage at subzero temperatures or under temperature fluctuations.
Crystallization is partial or complete solidification of the material. This is a normal phenomenon that does not degrade the epoxy resin and does not affect the material properties.
To decrystallize the material, it must be kept at a temperature of 40°C to 60°C for at least 2–3 hours. Since the decrystallization process at the job site is often difficult or impossible, it is strongly recommended to store and transport all epoxy products at positive temperatures in the range from +5°C to +30°C.
Material consumption: 0.7 kg/m².
| Topcoat | Praspan® EP-P125 substrate |
| Praspan® UP-P100 | Not compatible |
| Praspan® EP-P100 | Compatible |
| Praspan® EP-P110 | Compatible |
| Praspan® EP-P125 | Compatible |
| Praspan® UP-C300 | Not compatible |
| Praspan® EP-C200 AS | Not compatible |
| Praspan® EP-C250 | Not compatible |
| Praspan® EP-C300 | Not compatible |
Material parameters and substrate requirements (TDS/passport).
| Mixture density at 20°C | 1400 kg/m³ |
| Mixture viscosity at 20°C | 1500 mPa·s |
| Gel time at 20°C on the surface | 60 minutes |
| Gel time at 20°C in volume (in a bucket) | 15 minutes |
| Intercoat interval at 20°C, minimum | 24 hours |
| Intercoat interval at 20°C, maximum | 36 hours |
| Material consumption per 1 m² | 0,7 kg |
| Curing time at 20°C, pedestrian traffic | 24 hours |
| Curing time at 20°C, light traffic load | 2 days |
| Curing time at 20°C, full traffic load | 3 days |
Estimated calculation based on area and thickness.
TDS, MSDS and system certificates.
PDF · 2.9 MB
PDF · 8.5 MB
PDF · 8.3 MB
PDF · 2.2 MB
Quick contact
Message us or leave a request — we will respond quickly.