LBC Industrial Floor LBC Industrial Floor · Repair of old floors and coatings

Repair of old floors and coatings

Local “patches” of damage, dust, delamination. We carry out a survey and select a fast restoration technology.

We select an economically optimal solution for your facility

Warehouse in Tashkent, Muynakskaya St., 135. We work across Uzbekistan and Tajikistan. Average engineer response time is up to 15 minutes.

When this solution is suitable

Local “patches” of damage, dust, delamination. We carry out a survey and select a fast restoration technology.

Repair of old floors and coatings
  • • areas with heavy equipment traffic (forklifts, pallet trucks, trolleys);
  • • receiving/shipping areas, gates, ramps (if any);
  • • manual work, picking and packing areas;
  • • facilities with strict cleanliness and dust-control requirements (pharma, food);
  • • facilities with tight commissioning deadlines;
  • • where the concrete is already dusting or damaged;
  • • areas exposed to chemicals (oils, reagents, detergents);
  • • projects at the construction stage, where the floor system can be specified from the start.

Recommended floor systems for different zones

Baseline decision matrix: the final floor system and thickness are confirmed after analysing the substrate condition and loads for a specific site.

Zone Floor system Loads and conditions Time to service
Ремонтные составы и герметики Repair compounds and sealants

A selection of repair compounds, screeds and sealants for cracks, potholes and joints.

Все наши ремонтные составы, стяжки и герметики для трещин, выбоин и швов. по ТДС
Оборудование Floor repair equipment

Equipment and consumables for surface preparation and repair: grinding, dust extraction, diamond tools.

Шлифовка/пылеудаление/алмазный инструмент и расходники для ремонта пола.
Full coating renewal Epoxy system 2–3 mm (R10–R11)

Seamless 2–3 mm epoxy flooring system for dry and moderately damp areas. Resistant to cleaning and alkaline solutions; adjustable surface roughness up to R11.

R10–R11 · $$

After substrate preparation: 2–3 mm epoxy, quartz broadcasting by zones. ~48 h
Harsh conditions / thermal shock Lincrete ST

Thick-layer PU-cement coating for hot wash-down, thermal shock and aggressive chemicals. Adjustable anti-slip profile up to R13.

R11–R13 · $$$$

For hot washdowns and acids/fats. 8–24 h
Temporary stabilization Concrete impregnation (dust-proofing)

Mineralizing concrete sealer to reduce dusting and absorption of existing concrete. Budget-friendly solution without stopping operations.

R9–R10 · $

Reduces dusting, but does not fix defects. 6–24 h

Floor system options are selected individually. Several coating types can be combined within one facility under a single specification and detailing for joints and transitions.

Need an estimate for a warehouse floor or an engineer consultation?

Fill out the short form — we’ll get in touch, clarify the facility details, and propose a technically sound and economically justified floor solution.

  • • we openly advise against over-specified or clearly weak systems;
  • • we calculate material consumption and provide an indicative budget;
  • • we help you prepare a technical brief for the designer and contractor.

We will contact you during business hours within 15 minutes to clarify details and prepare a proposal.