Срок работ

Hardened concrete floor for the Ak Bars Retro Cars exhibition complex in Kazan: high loads from exhibits and equipment, no dusting and comfort for visitors.

Area
1 000 м²
Duration
21 days
City
Казань
Year
2022

Project photos and videos

Photos from our database.

4 photos
Project photo: Срок работ
Project photo: Срок работ
Project photo: Срок работ
Project photo: Срок работ

Key parameters

A brief summary of operating conditions and the selected system.

Industry
Выставочный комплекс, музей, шоурум автомобилей
Floor system
Topping on fresh concrete (surface hardening)
Slip resistance
R10
Request an estimate for my project

Task — solution — result

How we transformed a problematic concrete floor into a floor system resistant to washing and chemical exposure.

01

Task

  • — Arrange a durable and aesthetically pleasing concrete floor with an area of about 1,000 m² that withstands static and dynamic loads from cars and special equipment, does not dust, is non-slip and looks good on camera.

02

Solution

  • — A system of hardened concrete floor based on the dry shake hardener Refloor CT‑S200 with subsequent grinding and protective impregnation was proposed. Before the work, the substrate was prepared, levels were checked and expansion joints were laid out. The surface was brought to the required R-class for safe movement of visitors and staff.

03

Result

  • — The venue received an even, non-dusting floor that withstands movement of cars and trolleys, maintains a presentable appearance with high attendance and does not require frequent repairs. Routine cleaning and preparation of the hall for events have been simplified.

Project KPIs

1 000  м²

Площадь

21  дней

Срок работ